Fast, Reliable New Detached ADU Across Redlands
A new detached ADU in Redlands typically runs $185,000-$340,000 all-in, from permit set through final inspection, with custom builds at the higher end and prefab or modular systems offering tighter ranges. We’re Ellery ADU Studio, and our crews serve Redlands from our Inland Empire office in the Riverside-San Bernardino corridor. If you’re on an oversized citrus-era lot near Smiley Heights or out on acreage toward the San Bernardino Mountains, the permitting path and utility coordination look different here than they do in Colton or Highland. Call (951) 379-3047 to schedule your free estimate - every project gets a written price before any work starts, per Haven Standard, Clause 1.
Why Ellery ADU Studio Moreno Valley Is Redlands’s Preferred New Detached ADU Company
We’ve designed, permitted, and built more than 900 ADUs since 2015, the year California’s ADU laws shifted. Our New Detached ADU team knows Redlands’s specific pathways because we’ve walked them - City Hall utility agreements, historic review submittals, and Title 24 compliance at 1,300 feet in CEC Climate Zone 10.
Redlands customers receive the same documentation we provide on every project: a written scope and price at signing, a documented photo record on every site visit, and the 365-Day Done Right Promise backed in writing. No designer-versus-builder blame gap. No change orders after the contract is signed. Under Clause 5 (No Surprises), the scope is locked.
Our license number appears on every page, and our crews are background-checked and uniformed. We coordinate dispatch from our Inland Empire office, with crews serving Redlands locally. A live person answers calls 24/7 - no voicemail queue, no callback that doesn’t materialize.
We also offer a Free Second Opinion on any written estimate already in hand. Bring us another contractor’s scope; we’ll tell you what’s missing.
Our New Detached ADU Services in Redlands

Custom Built ADU
Custom detached ADUs in Redlands start around $220,000 and run to $340,000+, depending on square footage, foundation type, and finish level. On citrus-era parcels in the historic core - think the neighborhoods off Cajon Street or the Smiley Heights area - we design for historic review from the first schematic, not as a retrofit. Massing, roofline, and materials like James Hardie siding are specified to pass character scrutiny before we ever submit for planning. On acreage lots, we scope septic setbacks, well-head separations, and grading and drainage before quoting, because a re-sited slab after discovery is not a surprise we pass to the owner.

Prefab ADU Installation
Prefab systems from Abodu and Cover typically land between $185,000 and $265,000 in Redlands, including site prep, foundation, utility connection, and final inspection. The factory-built envelope shortens weather-exposed construction time, which matters in CZ10 where summer highs exceed 105°F and crews lose productive hours to heat. But prefab does not bypass Redlands Municipal Utilities - the electric lateral and meter agreement still route through City Hall, and we coordinate that within our single contract. We specify and coordinate these systems under the same written price that governs our custom builds.

Modular ADU
Modular construction from Dvele or similar systems ranges $195,000-$280,000 in Redlands, offering precision-built volumes delivered to a prepared foundation. The value is in factory quality control and compressed site schedule. For outlying Redlands lots with long material hauls or limited equipment access, modular can reduce the number of site deliveries and the duration of crane or boom-truck rental. We scope haul routes and access clearances before quoting - a 14-foot module on a lowboy needs turning radius and overhead clearance that a standard flatbed does not.

Studio ADU and 1-Bed & 2-Bed ADU
Studio detached ADUs in Redlands typically run $185,000-$240,000; 1-bedroom units $210,000-$290,000; and 2-bedroom units $250,000-$340,000. The bedroom count drives Title 24 energy calculations, and in CZ10 those calculations are unforgiving. We size HVAC and insulation from the permit set forward, not as a value-engineering afterthought. An unconditioned garage conversion on the same block as our Cajon Street project had already failed its energy inspection when we started design; we learned from that and built the heat pump and R-15 continuous exterior insulation into the new detached ADU’s envelope from day one.

What happens when you call
- 1
A real person answersNo phone trees - you reach a local pro.
- 2
You get an upfront price rangeHonest numbers before anyone is dispatched.
- 3
A background-checked tech heads outLicensed & insured, dispatched right away.
- 4
You approve before work beginsNothing starts until you say go.
Trusted Brands We Service in Redlands
We specify and coordinate prefab and modular systems from Abodu, Cover, and Dvele, and we use James Hardie siding where historic review or durability demands it. Our Redlands projects draw from the same supplier relationships we’ve built across the Inland Empire, with material lead times and availability scoped into every written quote. We’re not locked to one factory or one cladding system - we match the product to the parcel, the budget, and the permitting pathway, whether that’s a Cover studio module on a standard suburban lot or a James Hardie-clad custom build facing historic review on Cajon Street.
Common New Detached ADU Problems We See in Redlands Homes

- Historic review delays on citrus-era parcels. Contractors bidding from Riverside or San Bernardino regularly underestimate the three-to-six-month addition when Redlands’s historic preservation program scrutinizes materials, massing, and character on Smiley Heights and Cajon Street lots. We build that timeline into our permit schedule from the first consultation.
- Redlands Municipal Utilities coordination treated as an SCE job. The city-run electric utility requires its own lateral, meter, and utility agreement through City Hall. Crews accustomed to Southern California Edison routinely stall here. We pull those agreements as part of our standard scope.
- Septic and well setbacks discovered after grading starts. On acreage around Redlands, the leach field or well head sometimes sits inside the planned ADU footprint or violates required separation. We survey and verify before the slab design is finalized, not after the excavator arrives.
- Title 24 failures from underbuilt envelopes in CZ10. Summer highs over 105°F and 30-40°F day-to-night swings demand rigorous insulation and right-sized HVAC. Garage conversions and detached ADUs treated as afterthoughts fail energy inspection. We engineer cooling loads into the permit set.
Pricing for New Detached ADU in Redlands, CA
Here’s what new detached ADU projects typically cost in Redlands, all-in from permit set through final inspection:
- Studio ADU (prefab or modular): $185,000-$240,000
- Studio ADU (custom build): $200,000-$260,000
- 1-bedroom ADU (prefab/modular): $210,000-$275,000
- 1-bedroom ADU (custom): $230,000-$290,000
- 2-bedroom ADU (prefab/modular): $250,000-$300,000
- 2-bedroom ADU (custom): $270,000-$340,000
What moves the number: foundation type (slab-on-grade vs. raised stem wall), utility run length to Redlands Municipal Utilities infrastructure, historic review cycles, septic or well work on acreage, grading and drainage on sloped lots, and finish selections. Every project receives a written line-item quote before any work begins - Haven Standard, Clause 1. No “call for pricing.” No change orders after signing. Call (951) 379-3047 for your free estimate.
We Also Serve Cities Near Redlands

Our crews work throughout the Inland Empire, including Redlands neighbors Colton, Highland, Yucaipa, and Grand Terrace. Each city has its own permitting authority and utility pathways - San Bernardino County or municipal - and we scope those differences before quoting, not after breaking ground.
Serving Redlands, CA - Our Local Coverage Area
We’re based in the Redlands area and know this community well. Use the map below to see our service coverage - if you’re nearby, we can almost certainly help.
FAQs - New Detached ADU in Redlands

Redlands Municipal Utilities, not SCE, serves almost all residential electric in the city. New detached ADU service laterals and meter agreements route through City Hall, with their own application, fee schedule, and inspection sequence. Contractors who work across the broader Inland Empire often assume SCE and lose weeks to re-coordination. We pull Redlands Municipal Utilities agreements as standard scope on every project. Call (951) 379-3047 for an exact quote - estimates are free.
Yes, if your parcel falls within a historic district or the city’s preservation overlay, which covers many lots along Cajon Street and in the Smiley Heights area. The review examines materials, massing, roofline, and character, and can add three to six months to permitting. We design for this scrutiny from the first schematic, specifying products like James Hardie siding and compatible rooflines before submission. Call (951) 379-3047 for an exact quote - estimates are free.
Septic leach fields and well heads must maintain state-mandated separations from structures and from each other, and on acreage parcels these features often predate modern surveys. We’ve seen leach fields sit directly inside a planned ADU footprint, forcing a complete re-site, new grading and drainage, and a revised foundation plan. We verify septic and well locations against county records and field confirmation before finalizing slab design. Call (951) 379-3047 for an exact quote - estimates are free.
Redlands sits in CEC Climate Zone 10, where summer highs exceed 105°F and day-to-night temperature swings of 30-40°F are common. Title 24 compliance here demands rigorous envelope performance: R-15 continuous exterior insulation, right-sized heat pumps, and calculated cooling loads that unconditioned garages rarely meet. We engineer these specifications into the permit set from the start, not as retrofits after failure. Call (951) 379-3047 for an exact quote - estimates are free.
We survey access roads for turning radius, overhead clearance, and weight limits before quoting. Modular deliveries on lowboys need 14-foot vertical clearance and specific approach angles; concrete pumper trucks need stable ground within hose reach of the foundation. Long hauls from Inland Empire suppliers add fuel and time costs that we line-item in the written quote. No discovery pricing after mobilization. Call (951) 379-3047 for an exact quote - estimates are free.
Written by Nadia Ellery, Owner at Ellery ADU Studio, serving Redlands since 2015.